Chinese New Year 2027: Factory Closure and Planning Guide for Importers

16 minute readUpdated 10/11/2026

Short answer Chinese New Year falls on 06/02/2027. China's official holiday runs from 05/02/2027 to 13/02/2027, nine days. Most factories stop production about 10 days before the Eve and restart two to three weeks after it. For goods shipped before the holiday, place standard orders by mid-November 2026.

Key takeaways

  • Official dates are out: the State Council notice of 05/11/2026 sets the Spring Festival holiday from 05/02/2027 to 13/02/2027, with workdays on 31/01 and 14/02.

  • The real stop is longer: lines stop about 10 days before the Eve, and most suppliers return 2 to 3 weeks after it (V-Trust).

  • Freight can jump, or not: Asia to US West Coast rates rose 23.00% in one week in January 2025. In 2026 the rush failed and rates fell 7.00%.

  • Roads are the bottleneck: before the 2026 holiday, Nansha trucking cost up to 300.00% more and factory-to-vessel time went from 5-7 to 10-14 days (SEKO).

  • Order date is the lever: in our example, an order placed on 14/12/2026 instead of 16/11/2026 reaches Rotterdam 32 to 67 days later.

Written by TRG Editorial Team · reviewed by importers

Reviewed by people who import from China every month. Every fee and rule is checked on the official page, last on 10/11/2026. How we check figures

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. It never changes our ranking. How we make money

You have stock to sell in March, and a factory in China that goes quiet in February. The Chinese New Year factory closure 2027 decides whether that stock arrives on time. Most guides give you the date of the festival and stop there.

Calendar strip January to March 2027: production winds down from late January, official holiday 05/02 to 13/02, restart late February, full output by mid-MarchChinese New Year 2027: when China really stopsHoliday dates: State Council notice of 05/11/2026. Factory bands are typical patterns (indicative).04/0111/0118/0125/0101/0208/0215/0222/0201/0308/03Mondays, January to March 2027Official public holiday05/02 to 13/02/2027Production winds downfrom about 19/01-26/01Workers travel backrestart 19/02-26/02Ramp-up to full outputoften mid-MarchEve 05/02make-up workdays 31/01 and 14/02Lantern Festival 20/02Typical full stop: 2 to 4 weeks. Slow output: 4 to 6 weeks. Official days off: 9.
the 2027 shutdown window: 9 official days off, 4 to 6 weeks of slow output

The date is the easy part. What costs money is the month around it: early stops, scarce trucks, rate jumps and new workers. This guide gives the official 2027 dates, a week-by-week plan and a worked example.

Chinese New Year factory closure 2027: the quick answer

The table gives the dates that matter. Only the holiday dates are official; factory dates are typical patterns to confirm with each supplier in writing.

MilestoneDate (2027)Status
Make-up workday before the holidaySunday 31/01/2027Official
Production lines stop (about 10 days before the Eve)around 26/01/2027Typical pattern (V-Trust)
Chinese New Year's Eve, holiday startsFriday 05/02/2027Official
Chinese New Year's DaySaturday 06/02/2027Official
Holiday endsSaturday 13/02/2027Official
Make-up workday after the holidaySunday 14/02/2027Official
Lantern Festival (not a day off)Saturday 20/02/2027Calendar date
Most suppliers back at work19/02/2027 to 26/02/2027Typical pattern (V-Trust)
Full capacity againaround mid-March 2027Typical pattern (Maersk)

So the official break is nine days, but the practical break is two to four weeks of no output. Your choice: ship before the holiday, or plan for after the restart.

Decision tree with three questions: order by 20/11/2026, factory finished by 15/01/2027, urgent stock, leading to ship before, push, split or plan after the restartBefore or after Chinese New Year? A three-question testFor a 5-week production run and sea freight. Move each date earlier by the extra weeks your product needs.Order signed and deposit paidby about 20/11/2026?YesShip before the holidaybook space now, inspect in late DecemberNoFactory confirms in writing: goodsfinished and inspected by 15/01/2027?YesTight: push it, pay for speedexpect rush trucking and rolled boxesNoIs part of the stock urgent?lost sales cost more than air freightYesSplit the orderair the urgent part, sea the rest laterNoPlan for after the restartproduction from about 22/02/2027Dates are TRG planning assumptions (indicative), based on State Council dates and V-Trust's restart pattern.Always add your own sea transit time and customs time to the dates above.
three questions decide whether your order ships before or after the holiday

New to buying from China? Our step-by-step guide to importing from China shows where this planning fits in a full order.

Official 2027 holiday dates from the State Council

The General Office of the State Council issued the 2027 notice on 05/11/2026, as document No. 10 [2026]. Every date below comes from that notice on gov.cn.

HolidayDays off (2027)LengthMake-up workdays
New Year's Day01/01 to 03/013 daysnone
Spring Festival (Chinese New Year)05/02 to 13/029 days31/01 and 14/02
Qingming (Tomb Sweeping)03/04 to 05/043 daysnone
Labour Day01/05 to 05/055 days08/05
Dragon Boat Festival09/061 daynone
Mid-Autumn Festival15/091 daynone
National Day (Golden Week)01/10 to 07/107 days26/09 and 09/10

A make-up workday is a Saturday or Sunday that becomes a normal working day. China moves weekend days to create longer breaks. Do not assume a factory is closed every weekend near a holiday; it may be working.

Year line and cards of China's seven 2027 public holidays with days off, make-up workdays and impact on factoriesChina's 2027 public holidays at a glanceSource: State Council General Office notice No. 10 [2026], issued 05/11/2026. Impact on factories is TRG's reading.JanFebMarAprMayJunJulAugSepOctNovDec12345671New Year01/01-03/01 · 3 days offno make-up dayLow impact2Spring Festival05/02-13/02 · 9 days offwork 31/01, 14/02Very high impact3Qingming03/04-05/04 · 3 days offno make-up dayLow impact4Labour Day01/05-05/05 · 5 days offwork 08/05Medium impact5Dragon Boat09/06 · 1 day offno make-up dayLow impact6Mid-Autumn15/09 · 1 day offno make-up dayLow impact7National Day01/10-07/10 · 7 days offwork 26/09, 09/10High impactNot a holidayLantern Festival 20/02many workers come backonly after this dateMake-up workdays are Saturdays or Sundays that become normal workdays. Golden Week (7) is the second shutdown of the year.
China's seven public holidays in 2027, with make-up workdays

Two holidays matter most for importers. The Spring Festival is the long one, because migrant workers travel home across the country. National Day Golden Week, from 01/10/2027 to 07/10/2027, is the second shutdown. It is shorter, but it falls in the busiest season for Christmas stock.

The short holidays cost one to five days each. Add them to any delivery date your supplier quotes for April, May, June or September.

📌 Note: Private companies may give extra days off beyond the official calendar, as China Briefing points out. The official notice is the minimum break, not the factory's real one. Ask each supplier for its own closing and reopening dates.

How long factories really close, and why workers return late

The official holiday is nine days. Factories close for much longer, for three reasons. First, lines stop early. V-Trust, an inspection company, says suppliers begin halting operations about 10 days before the Eve. Subcontractors, such as print shops and carton makers, often stop first.

Second, workers travel far. Many factory workers come from inland provinces. They leave early to beat the travel peak, and many stay home one to two weeks longer than the official break. V-Trust says most suppliers do not resume normal work until two, sometimes three, weeks after the Eve.

Third, working through the holiday is expensive. China Briefing notes that work on a statutory holiday must be paid at least 300.00% of the normal wage, and 200.00% on other rest days. Few factories pay that for export orders. So the lines stay dark.

Illustrative curve of factory output falling before the Eve and recovering over four to six weeks after itFactory output around Chinese New Year (illustrative)Shape built from V-Trust and Maersk descriptions. Weeks counted from the Eve, 05/02/2027. Not measured data.NormalHalfStoppedW-6W-5W-4W-3W-2W-1EveW+1W+2W+3W+4W+5W+69 days offrush and overtimelines stop ~10 days before Evemost suppliers restart2-3 weeks after Evefull capacity by about mid-MarchOffice staff often answer email for 1-2 weeks longer than the lines run. Subcontractors may stop first.Sources: V-Trust, post-CNY quality issues; Maersk, Chinese New Year 2026 guide (both checked 10/11/2026).
output drops before the Eve and recovers over four to six weeks (illustrative shape)

Maersk's 2026 guide describes the same curve from the freight side. Factories reduce output two to three weeks before the holiday. They may not reach full capacity until mid-March. The ripple effect on logistics can last up to six weeks.

Some workers never come back. The factory then trains new staff on your order, which is why quality risk peaks after the holiday.

Here is what this means in practice: read "we close on 05/02" as "we stop producing around 26/01". Read "we reopen on 15/02" as "normal output from late February".

Fees and rules change often. Get the TRG Importer Brief: one short email a week with changes that affect importers.

Freight rush and rate increases before the holiday

Every importer tries to ship before the factories close. That creates a pre-holiday rush for vessel space from December to late January. Carriers often answer with general rate increases (GRIs) and peak season surcharges. Whether those stick depends on the year.

In January 2025 the rush was strong. The Freightos Baltic Index (FBX) for Asia to US West Coast rose 23.00% in one week, to USD 5,929.00 per forty-foot container (FEU). Asia to US East Coast rose 13.00%, to USD 6,934.00. Freightos linked the rise to GRIs "supported by pre-Lunar New Year demand".

In 2026 the opposite happened. Drewry's World Container Index (WCI) fell for a fourth week on 05/02/2026, with the composite down 7.00% to USD 1,959.00. Drewry said the usual rush was "failing to materialise in 2026". Carriers cut sailings aggressively instead, with 63 blank sailings announced for February.

Diverging bar chart: container rates rose 3.00% to 23.00% in early January 2025 but fell 5.00% to 9.00% before the 2026 holidayThe pre-holiday freight rush is common, not guaranteedWeekly change in spot rates per 40-foot container, a few weeks before two Chinese New Yearsrate per 40 ftWeek of 07/01/2025 (Freightos FBX): rates up on pre-holiday demandAsia to US West Coast+23.00%USD 5,929.00Asia to US East Coast+13.00%USD 6,934.00Asia to North Europe+8.00%USD 5,558.00Asia to Mediterranean+3.00%USD 5,630.00Week to 05/02/2026 (Drewry WCI): the rush is "failing to materialise"Shanghai to Los Angeles-8.00%USD 2,239.00Shanghai to New York-5.00%USD 2,819.00Shanghai to Rotterdam-9.00%USD 2,164.00Shanghai to Genoa-7.00%USD 3,048.00Latest Drewry composite before this guide: USD 4,389.00 per 40 ft on 05/11/2026. Check the index again when you book.Sources: Freightos update of 07/01/2025; gCaptain report of 05/02/2026 quoting Drewry (checked 10/11/2026).
weekly rate changes before two Chinese New Years: a rush in 2025, none in 2026

What about 2027? Nobody can promise a number. On 05/11/2026 the Drewry composite stood at USD 4,389.00 per FEU, 124.00% higher than a year earlier. Shanghai to Rotterdam was USD 3,615.00, and Shanghai to Los Angeles USD 7,539.00. These levels are indicative and change every week.

So plan for space, not for a price. Book early, ask your forwarder for two backup sailings, and keep a budget line for a surcharge.

Thinking of air instead? Air space also tightens in the rush; our sea vs air freight from China comparison gives the break-even.

Port, trucking and courier cut-off dates

China's big container ports work through the holiday. The weak link is the truck between the factory and the port. Drivers go home too, so trucking prices rise and slots disappear.

SEKO Logistics reported the 2026 pattern on 10/02/2026, five days before that year's holiday began. Trucking at Nansha cost up to 300.00% more than in normal periods. Drayage at Yantian rose about 200.00%, and Shekou up to 200.00%. Factory-to-vessel time stretched to 10-14 days, against 5-7 days normally.

South China ports before the 2026 holiday: trucking up to 300.00% dearer and factory-to-vessel time 10-14 days instead of 5-7Before the holiday, the bottleneck is the road to the portSouth China ports, pre-holiday weeks of 2026, as reported by SEKO Logistics on 10/02/2026 (indicative for 2027)Trucking and drayage cost increaseNanshaup to +300.00%Yantianabout +200.00%Shekouup to +200.00%vs normal periods; drivers go home earlyFactory gate to vessel, in days051015Normal5-7 daysRush10-14 daysNansha: drop-off only 5 days before sailingMore rolled containers too: cargo that misses its vessel waits for the next one, sometimes after the holiday.
pre-holiday pressure at South China ports in 2026 (indicative for 2027)

Ports also tighten their own rules. From 29/01/2026, Nansha limited container drop-off to five days before vessel departure. Rolled containers became more frequent, meaning cargo missed its booked vessel. Expect similar measures in late January 2027, and ask your forwarder for the terminal's cut-off rules.

Courier cut-offs for samples and documents

International couriers stop pickups during the holiday. FedEx's China holiday table for 2026 lists no pickup from 15/02/2026 to 22/02/2026, with pickups again on 23/02/2026. That matched the first eight days of the 2026 official holiday. The 2027 courier tables are not published yet, so treat the following as indicative.

If the same pattern holds, expect no FedEx pickups from about 05/02/2027 to 12/02/2027. Send samples, original documents and spare parts by 29/01/2027 at the latest.

Domestic express firms differ. Before the 2026 holiday, SF, JD Logistics and Deppon kept running. Some customers paid peak fees of CNY 0.10 to 1.50 per kg. Smaller franchise networks may still stop.

Week-by-week planning timeline, from order to delivery

Work backwards from the date you need the goods on your shelf. The timeline below counts weeks from the Eve, 05/02/2027. It assumes a five-week production run and sea freight. If your run takes eight weeks, move every date three weeks earlier.

Week-by-week timeline from 12/10/2026 to 15/03/2027 with order, freight, inspection, holiday and restart milestonesYour week-by-week plan, counted back from the EveWeek of (Monday). Example for a 5-week production run and sea freight. Shift every date if your run is longer.W-1612/10/2026New or custom product: sample approved, specs signedW-1209/11/2026Standard order placed, deposit paid, closing date in writingW-1116/11/2026Materials bought, production slot confirmedW-930/11/2026Freight booked, at least 3 weeks before cargo is readyW-714/12/2026Last order date for a 5-week run: no buffer left (example B)W-621/12/2026Production ends, pre-shipment inspectionW-528/12/2026Balance paid, container loaded and gated inW-311/01/2027Last comfortable sailings; send documentsW-218/01/2027Lines wind down; trucks and couriers scarceW001/02/2027Eve on Fri 05/02. Holiday 05/02-13/02, work again 14/02W+215/02/2027Restart week; Lantern Festival 20/02W+615/03/2027Most factories back to full output; inspect first runsdecide and ordermake and shipdanger zonerestartTRG planning ranges (indicative). Holiday dates: State Council notice of 05/11/2026.
the week-by-week plan, from October 2026 to March 2027 (indicative)

1. October to mid-November 2026: decide and order

New or custom products need the most time. Approve the sample and sign the specification by mid-October. SEKO advises finalising complex orders as early as August to September. Place standard orders and pay the deposit in the week of 09/11/2026.

Ask the factory three questions in writing: its last production day, its reopening day, and the date by which materials must be bought. Our guide to supplier contract clauses for China shows how to turn the delivery date into a clause.

2. Late November to December 2026: make and book

Book freight at least three weeks before the cargo is ready, as SEKO recommends. For a container ready on 21/12/2026, that means booking by 30/11/2026. Production should end around 21/12/2026. Book the pre-shipment inspection for the following days.

3. Late December 2026 to mid-January 2027: ship

Pay the balance only after the inspection passes. Then load and gate in the container. The last comfortable sailings leave in the first half of January. DocShipper uses a departure around 10/01/2027 as a planning assumption for stock in US or EU warehouses by late February.

4. Late January to mid-March 2027: hold and restart

From about 18/01/2027, expect slow trucks and rolled boxes. After 14/02/2027, ask for a written restart date and book an inspection of the first output.

Quality risks after the holiday (new workers)

The weeks after the restart are the riskiest of the year for quality. V-Trust states that the risk of quality issues is "at its peak" right after Chinese New Year. Skilled workers who did not return are replaced by new hires.

At the same time, the factory has a backlog. V-Trust notes that suppliers and their subcontractors often have a queue of orders dating from early December. A team under pressure, with new staff, is where defects appear. Subcontractors that reopen late add missing parts and wrong cartons.

Four post-holiday quality risks paired with controls: DUPRO, written restart date, subcontractor check, frozen specificationAfter the holiday: four quality risks and the fix for eachV-Trust: the risk of quality issues "is at its peak" right after Chinese New Year (checked 10/11/2026)RISKCONTROLNew, unskilled workers on the lineskilled staff left or came back lateInspect the first output (DUPRO)check the first pieces off the lineBacklog from December ordersfactory rushes to catch upGet a written restart and ship dateand a slot in the restart queueSubcontractors still closedparts, prints or cartons arrive lateAsk which parts are outsourcedconfirm each subcontractor is backMaterial swaps to save timea different resin, fabric or cartonFreeze the spec and golden sampleno change without written approvalDUPRO: during-production inspection. Golden sample: the signed reference sample both sides keep.
four post-holiday risks and the control that answers each

The answer is not more trust, it is earlier checks. Book a during-production inspection (DUPRO) on the first output after the restart, not only a final check. A DUPRO finds a systematic defect while it can still be fixed on the line.

Freeze the specification too. A factory in a hurry may swap a material or a carton supplier to save time. Write in the order that no change is allowed without your written approval. Keep a signed golden sample on both sides.

For AQL levels and inspection costs, read our pre-shipment inspection guide.

Negotiation tips before Chinese New Year

The months before the holiday change the balance of power. Factories are full, so they pick the orders that suit them. Your aim is a firm slot, not the lowest price. These five moves help.

1. Ask for the factory's own calendar in writing

Ask for the last production day, the reopening day and the full-staff date. Put them in the purchase order.

2. Lock materials early

Raw materials sell out before the holiday too. Pay the deposit early if the factory buys your materials now, and ask for a receipt or photo.

3. Trade flexibility for a slot

Small orders get pushed aside in the rush. You can accept a split shipment, or a slightly later ship date, in exchange for a confirmed production slot. Avoid opening an MOQ negotiation at this point. Our guide on how to negotiate MOQ with Chinese suppliers explains why the pre-holiday peak is the wrong time.

4. Tie the balance to inspection, not to the holiday

Some suppliers ask for the full balance before they close, even if goods are not ready. Keep the balance tied to a passed inspection. If goods will finish after the holiday, the balance waits until after the holiday too.

5. Agree what happens if the date slips

Write a simple rule: if goods miss the ship date, the supplier pays the extra freight or a fixed discount. A modest remedy is more likely to be signed.

Worked example: an order placed in November vs December

This is a labelled example, not a real shipment. A Rotterdam importer buys kitchen goods from a factory near Shanghai. Production takes five weeks. The sea transit Shanghai to Rotterdam is about 27 days, according to Shiphub (indicative). The only difference between Order A and Order B is the order date.

LineOrder A (example)Order B, best case (example)Order B, one-week slip (example)
1. Order and depositMon 16/11/2026Mon 14/12/2026Mon 14/12/2026
2. Production ends (line 1 + 35 days)Mon 21/12/2026Mon 18/01/2027about a week of work left when lines stop around 26/01/2027; finished 22/02 to 28/02/2027
3. Inspection and balance22/12 to 23/12/2026Tue 19/01/2027after restart: Mon 01/03/2027
4. Factory to vessel8 days (normal season)13 days (rush: 10-14 days)7 days
5. Vessel departs (line 3 + line 4)Thu 31/12/2026Mon 01/02/2027Mon 08/03/2027
6. Arrives Rotterdam (line 5 + 27 days)Wed 27/01/2027Sun 28/02/2027Sun 04/04/2027
7. In stock (line 6 + 5 days)Mon 01/02/2027Fri 05/03/2027Fri 09/04/2027
8. Delay vs Order A0 days32 days67 days

Order A has slack everywhere. It finishes before Christmas and sails before the rush. Order B has no slack at all. Its best case needs the factory to finish on time, a truck in the rush and a vessel that does not roll.

Gantt of the worked example: order placed 16/11/2026 in stock 01/02/2027, order placed 14/12/2026 in stock 05/03/2027 or 09/04/2027Example: one month later to order, five to ten weeks later in stockRotterdam buyer, 5-week run, about 27 days at sea (indicative). Dates from the worked example table.CNYDecJanFebMarAprA: ordered 16/11/2026in stock 01/02/2027B: ordered 14/12/2026best case: 05/03/2027B: one-week sliplate case: 09/04/2027productioninspection, truck, portat seacustoms and deliveryfactory closed
the same order, one month apart: 32 to 67 days later in stock (example)

Now add the costs. Assume the importer pays USD 400.00 for trucking to the port in a normal week. This is an assumption. At the "about 200.00%" increase SEKO saw at Yantian, the rush truck costs USD 400.00 × 3.00 = USD 1,200.00. That is USD 800.00 more for the same trip.

The bigger cost is lost sales if Order B was meant for a March promotion. One month of earlier ordering bought up to ten weeks of safety.

What goes wrong in practice (and what to do)

Most Chinese New Year problems repeat every year. Here are five common ones, with the fix for each.

1. The factory "forgets" the closing date

A supplier confirms a January ship date in November, then admits in mid-January that goods will finish after the holiday. Ask for a production update with photos every week from early January. If progress stalls, decide early: split the order or move it to after the restart.

2. Goods are ready but the truck is not

The cargo is packed on 22/01/2027, but no truck is free and the vessel cut-off passes. Book the truck with the vessel, and keep a backup sailing.

3. The container rolls to a sailing after the holiday

Your box sits at the terminal through the break. You may also pay storage or detention charges. Our guide to demurrage and detention explains free days and how to dispute charges.

4. The balance is paid, the goods are not finished

The supplier asks for the balance "before the accountant goes home". You pay, and the goods finish in March with defects. Never pay the balance before inspection, holiday or not. Treat the nine official days as non-banking days in China when you plan transfers.

5. The first post-holiday batch fails

New workers produce wrong colours or weak seams. Caught at a DUPRO, the factory reworks it; caught on arrival, you own it. Book the inspector before the restart.

By region: MENA, Europe/UK, USA

MENA (Gulf, Saudi Arabia, Egypt, Morocco, Jordan): in 2027 Ramadan is expected to begin on 08/02/2027 (indicative), three days after the Eve. The UAE's Astronomy Centre projects Eid al-Fitr around 09/03/2027 or 10/03/2027, subject to moon sighting. Ramadan and Eid stock must therefore ship before Chinese New Year. Sea transit from South China to the UAE takes about 15 to 25 days (Goodhope, indicative).

Europe and the UK: Easter 2027 falls early. GOV.UK lists Good Friday on 26/03/2027 and Easter Monday on 29/03/2027. Spring stock that misses the pre-holiday sailings may arrive around Easter. Sea transit to North Europe takes about 27 days or more, depending on the route.

USA: Washington's Birthday (Presidents' Day) is on 15/02/2027, per the US Office of Personnel Management. Transpacific sea transit from Shanghai to Los Angeles takes about 14 to 20 days port to port for a full container (Ship4wd, indicative). East Coast routes take longer.

Chinese New Year 2027 checklist

Glossary

Spring Festival: the official Chinese name for Chinese New Year, also called Lunar New Year.

Make-up workday: a Saturday or Sunday that becomes a working day to create a longer holiday.

Golden Week: the seven-day National Day holiday from 01/10 to 07/10.

GRI: general rate increase, a carrier's announced rise in base freight rates.

Blank sailing: a scheduled vessel voyage that a carrier cancels, removing its space.

Rolled container: a container that misses its booked vessel and moves to a later one.

Drayage: the truck move of a container between a factory or depot and the port.

DUPRO: during-production inspection, done when part of the order is made.

FEU: forty-foot equivalent unit, the standard unit for a 40-foot container.

FAQ

When is Chinese New Year 2027?

Chinese New Year falls on Saturday 06/02/2027. The official holiday runs from 05/02/2027 to 13/02/2027. Sunday 31/01 and Sunday 14/02 are working days.

How long do Chinese factories close for Chinese New Year 2027?

Expect two to four weeks with no output. Lines usually stop about 10 days before the Eve. Most suppliers return two to three weeks after it, and full capacity often comes back around mid-March.

When should I place orders before Chinese New Year 2027?

For a standard five-week run and sea freight, by mid-November 2026. Custom or new products need orders by mid-October. Add weeks if your run is longer.

When do Chinese factories reopen after Chinese New Year 2027?

Many reopen officially on 14/02/2027, a make-up workday. Real production usually restarts between 19/02/2027 and 26/02/2027, after the Lantern Festival on 20/02. Ask each supplier for its date.

Do freight rates always go up before Chinese New Year?

No. Rates rose sharply in January 2025, but fell before the 2026 holiday. Book space early rather than betting on a price.

What is the last courier date before Chinese New Year 2027?

The 2027 courier tables are not out yet. In 2026, FedEx China stopped pickups on the first day of the official holiday. Send urgent samples by 29/01/2027 to be safe.

Why is quality worse after Chinese New Year?

Some skilled workers do not return, and new hires learn on your order. Factories also rush to clear a backlog. Book an inspection of the first output after the restart.

Is Golden Week as disruptive as Chinese New Year?

It is shorter, from 01/10/2027 to 07/10/2027, with make-up workdays on 26/09 and 09/10. Fewer workers travel far. But it hits Christmas production, so plan around it too.