Factory Audit in China (2026): Types, Costs and How to Read the Report

17 minute readUpdated 21/11/2026

Short answer A factory audit in China is an on-site check of the supplier itself, not of one batch of goods. Choose a manufacturing audit for capacity and quality systems, or a social audit (amfori BSCI, SMETA) when buyers require it. V-Trust publishes USD 398.00 per man-day all-inclusive; QIMA, HQTS, Intertek, SGS and Bureau Veritas quote on request.

Key takeaways

  • Four audit types answer four questions: is the company real, can it make your product, are workers treated legally, does quality work?

  • V-Trust's published audit price is USD 398.00 per man-day, travel and weekends included, with a signed report within 2 days.

  • Social audits have their own scales: amfori BSCI rates 13 performance areas from A to E; SMETA is not a pass or fail certificate.

  • Bureau Veritas terms charge 50.00% of fees for cancelling 3 to 5 working days before an audit, and 100.00% inside 3 days.

  • In our worked example, a USD 796.00 audit pays off if it cuts failure risk by 1.66 points on USD 120,000.00 of orders.

Written by TRG Editorial Team · reviewed by importers

Reviewed by people who import from China every month. Every fee and rule is checked on the official page, last on 21/11/2026. How we check figures

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. It never changes our ranking. How we make money

You have a promising supplier, good samples and a quote that works. Before you place a large order, someone suggests a factory audit in China. A China factory audit checks that the factory is real and able to make your order. Two questions matter: is it worth the money, and which audit do you need?

Stylised factory with five audit areas (office, warehouse, production, QC lab, workers) and a comparison of a factory audit with a pre-shipment inspectionA factory audit checks the supplier, not one batchThe auditor walks five areas of the factory and records evidence in each one1Officelicence, records2Warehousematerials, rejects3Productionlines, machines4QC labtests, calibration5Workerssafety, hoursAuditor's route: 1 to 2 man-days on site (indicative)Factory auditCan this supplier make every future order?Book before the first large depositPre-shipment inspectionIs this one batch good enough to ship?Book before every balance payment
A factory audit checks the supplier itself: offices, warehouse, production lines, quality lab and workers

Most guides list audit types and stop there. What decides the question is simpler: how much money and time you will put into this supplier. This guide covers audit types, site checks, published prices, report scoring and a worked example of cost against risk.

Factory audit in China: the quick answer

An audit and an inspection answer different questions. An inspection checks one batch of finished goods. An audit checks the company that will make all your future batches. Our pre-shipment inspection guide covers AQL sampling and batch checks, so this page stays on the supplier.

Use the table to match your question to an audit type. The man-day counts are indicative ranges from one provider's published guide (QCadvisor); always ask for a written quote.

Audit typeQuestion it answersTypical length (indicative)When to book
Supplier verificationIs the company real, licensed and at this address?1 man-day or lessBefore the first deposit
Manufacturing (technical) auditCan this factory make my product, at my volume?1 to 2 man-daysBefore a large or long-term order
Social / ethical audit (amfori BSCI, SMETA)Are workers treated legally and safely?Depends on headcountWhen a retailer or law requires it
Quality-system audit (ISO 9001-based)Does the quality system work in practice?Added modules, or a certification auditRegulated or high-spec products

The decision tree below starts from your order, not from the audit catalogue. Desk checks come first because they are free. Our checklist to verify a Chinese supplier shows how to check the business licence online before you pay anyone.

Decision tree for choosing a factory audit in China: desk checks, then manufacturing audit or inspection only, then social audit or ISO 9001-based auditWhich audit do you need? Start from your orderFree desk checks first; pay for a site visit only where the answer mattersDesk checks passed?licence, address, legal nameNoStop or verifysupplier verification visitYesLarge or repeat orders?money at risk many times the feeNoInspection onlypre-shipment check per batchYesManufacturing auditcapacity, machines, quality controlDo your buyers ask for more?retailer code, law, product schemeLabour rulesQuality systemSocial auditamfori BSCI or SMETAISO 9001-based auditcheck certificate validity
Decision tree: desk checks first, then the audit type that matches your order and your buyers

The four types of factory audit

Providers use different names for the same service. HQTS says a supplier audit "determines whether the Chinese supplier is legitimate", while a factory audit evaluates production and quality systems.

1. Supplier verification audit

This is the lightest check. HQTS lists legal company information, bank information, human resources, export capability and order management. HQTS adds that a supplier audit is "generally shorter" and does not always need a site visit.

Here is what this means in practice: if desk checks raise one doubt, such as a new address, a visit settles it. It does not tell you whether the factory can make your product well.

2. Manufacturing (technical) audit

This is the audit most importers mean. QIMA's standard Manufacturing Audit covers the factory profile, production capacities, machinery condition, workflow and organisation charts, and quality assurance systems. V-Trust adds R&D and "special client requirements" in a tailor-made checklist.

QIMA offers add-on modules: social responsibility, procurement, R&D sampling capacity, hygiene and safety, environmental impact and RoHS. Add only the modules your product needs, because each one adds auditor time.

3. Social or ethical audit: amfori BSCI and SMETA

Social audits check working hours, wages, child labour, forced labour, health and safety. The two codes most European retailers ask for are amfori BSCI and SMETA (Sedex Members Ethical Trade Audit). QIMA also lists WRAP, ICS, ICTI Ethical Toy Program and its own Best-in-Class protocol.

SMETA always covers two founding pillars: labour standards and health and safety. The 4-pillar version adds environment and business ethics. Sedex says the 4-pillar version is used in around 70.00% of SMETA audits.

4. Quality-system audit (ISO 9001-based)

ISO 9001 is the international standard for quality management systems. ISO published the new edition, ISO 9001:2026, on 16/09/2026. Factories certified to the 2015 edition move to it during their certification cycle. NSF expects a transition of about three years (indicative).

A quality-system audit checks whether the factory follows its own procedures. A certificate on the wall is only a starting point. Check that the certificate is valid and accredited on IAF CertSearch, the global database for accredited management system certificates. A 2015-edition certificate stays acceptable during the transition.

Four cards comparing supplier verification, manufacturing, social and quality-system audits: what each checks, who asks for it and its limitFour audit families, four different questionsNames vary by provider; the scope on the quote is what countsSupplier verificationIs the company real?CHECKS• Licence, name, address• Bank and export records• Staff and order handlingASKED BYYou, before a depositLIMITCannot judge qualityManufacturing auditCan it make my product?CHECKS• Capacity, production lines• Machines, maintenance• Quality control, R&DASKED BYYou, before big ordersLIMITDoes not check a batchSocial auditAre workers treated legally?CHECKS• Hours, wages, child labour• Health and safety• BSCI: 13 areas, A to EASKED BYEU/UK/US retailersLIMITNot proof of tracingQuality-system auditDoes the QMS work?CHECKS• ISO 9001 procedures• Records, calibration• Corrective actionsASKED BYRegulated productsLIMITCertificate alone is weak
The four audit families side by side: what each checks, who asks for it and what it cannot tell you

What auditors check on site, area by area

An audit day follows the flow of the factory. The auditor usually starts in the office, walks the production floor, and ends with interviews and a closing meeting. Each stop produces evidence: photos, document copies and notes.

1. Office and documents

The auditor matches the business licence, address and legal representative with what you were told. They review organisation charts, customer lists and export records. HQTS includes bank information and export capability in its supplier audit scope.

2. Incoming materials and warehouse

Here the auditor asks how raw materials are checked on arrival. They look for labelled storage, separated rejects and traceable batches. A warehouse with no quarantine area for rejected parts is a common finding.

3. Production lines and machines

The auditor counts lines and machines, checks maintenance records and notes how many are actually running. QIMA lists "the condition of machinery and equipment" as a standard point. This is where stated capacity meets reality.

4. Quality control and testing

The auditor looks for in-process checks, final inspection records and calibrated tools. HQTS lists in-house testing and inspection in its standard scope. Ask the auditor to photograph test equipment with its calibration label.

5. People, safety and the closing meeting

Even a manufacturing audit notes fire exits, protective equipment and working hours. A social audit goes deeper, with worker interviews and payroll checks. The day ends with a closing meeting, where findings are shared with the factory.

Stylised floor plan of a factory audit route with five numbered stops from the office to the closing meetingThe audit route: five stops, evidence at each oneStylised floor plan; real factories differ, the logic of the route does notOffice• Business licence on wall• Org chart, customer listWarehouse• Incoming material checks• Quarantine for rejectsProduction floor• Lines counted and running?• Maintenance records• Work instructions posted• Capacity vs your volume• Signs of subcontracting• Safety guards, fire exits• Photos of live productionQC lab• Test equipment• Calibration labelsCanteen / meeting• Interviews, safety• Closing meeting12345Ask for photos at every stop: gate sign, licence, machines running, test equipment with calibration label
Floor plan of a typical audit route: five stops, from the office to the closing meeting

Fees and rules change often. Get the TRG Importer Brief: one short email a week with changes that affect importers.

How much does a factory audit in China cost?

Only one of the six main providers publishes an audit price. V-Trust lists USD 398.00 per man-day, all-inclusive, with travel and weekends included. The others quote after you send the scope.

ProviderPublished audit price (05/11/2026)What the page says
V-TrustUSD 398.00 per man-dayAll-inclusive; signed report within 2 days; book 3 days ahead
QIMAQuote onlyPricing page offers a quote and a reply within one business day
HQTSQuote onlySix audit types listed; sample report on request
IntertekQuote onlyWCA social, SQP quality, GSV security, TGI environment programmes
SGSQuote onlyamfori BSCI page shows "Request a Quote"; no fee listed
Bureau Veritas"As agreed with client" in AsiaPublic terms list surcharges and cancellation fees

For a side-by-side view of booking, liability caps and inspection rates, see our QIMA vs HQTS vs V-Trust comparison. Here we focus on what moves an audit bill up or down.

1. The number of man-days

Bureau Veritas defines one man-day as up to 12 hours. That is up to 8 hours on site, 1 hour for a meal and 3 hours of travel. A bigger factory or a longer checklist adds man-days, and each one is billed in full.

2. Surcharges

Bureau Veritas's published terms add 20.00% for Saturday work, where Saturday is not a normal workday. Sunday or public holiday work adds 30.00%. An express booking within 48 working hours also adds 30.00%. V-Trust says weekend audits carry no extra charge.

3. Scheme fees for social audits

Sedex charges a fee for each SMETA audit uploaded to its platform. Its page states that, from 01/07/2025, SMETA audits are charged at GBP 185.00 per audit. The factory must be a Sedex member for the upload, so ask who pays the membership.

Bar chart of audit bills at USD 398.00 per man-day for one to three man-days, with the GBP 185.00 SMETA fee and Bureau Veritas surchargesWhat an audit bill looks like at USD 398.00 per man-dayV-Trust published all-inclusive rate (05/11/2026); other providers quote on request0.00400.00800.001,200.00Verification visit, 1 man-dayUSD 398.00Manufacturing audit, 2 man-daysUSD 796.00Large site or add-ons, 3 man-daysUSD 1,194.00USD, all-inclusive (travel and weekends included)Social audit scheme feeSedex: GBP 185.00 per SMETA auditfrom 01/07/2025, on top of auditor daysBureau Veritas surcharges (terms)+20.00% Saturday · +30.00% Sunday or holiday+30.00% express (within 48 working hours)
Example audit bills built from published rates: one to three man-days at USD 398.00, plus the GBP 185.00 SMETA fee

📌 Note: surcharges and scheme fees change. Re-check the provider page and ask for an all-inclusive quote in writing before you book.

Anatomy of a factory audit report and its scoring

Most providers do not publish their scoring formula. QIMA says its reports give an overview of findings, then a detailed section per audit area, with photos. Its ethical audits list "non-compliance findings with severity ratings" and a corrective action plan.

So read any audit report in four layers. First the summary score, then the section scores, then the findings, then the photos. The mock report below is fictional and shows where each layer sits.

1. Summary page

This shows the factory name, address, audit date, auditor and an overall result. Check that the address matches the business licence. A summary without an address is a warning sign.

2. Section scores

Manufacturing audits usually score each area, such as capacity, quality control and machinery. Scales differ by provider, so compare section scores, not overall percentages from different firms.

3. Findings and corrective action plan

Each non-conformity should name the area, the evidence and a severity. The corrective action plan (CAP) lists what the factory will fix and by when. Without dates, a CAP is only a wish list.

4. Photos and annexes

Photos should show the gate sign, machines running and test equipment. Annexes hold copies of licences and certificates. Photos of a clean, idle factory prove little about capacity.

Fictional sample manufacturing audit report annotated in four layers: summary, section scores, findings by severity and corrective action planAnatomy of a manufacturing audit reportFictional sample for illustration; scales and layouts differ by providerMANUFACTURING AUDIT REPORTFICTIONALFactory: Example Kitchenware Co., LtdAddress: matches business licence ✓Audit date 14/10/2026 · 2 man-days76.20%ConditionalSECTION SCORESCompany profile90.00%Production capacity82.00%Machinery75.00%Warehouse70.00%Quality control64.00%FINDINGSCriticalNone foundMajorNo calibration record for test scalesMinorRejected parts stored with good stockCORRECTIVE ACTION PLANCalibrate scales, send certificate: due 15/11/2026Mark quarantine area, send photos: due 30/11/20261SummaryCheck address and date first2Section scoresCompare sections, not totals3FindingsEvidence and severity each4CAPNo dates, no real plan
Fictional sample report: summary, section scores, findings with severity, and the corrective action plan

How amfori BSCI and SMETA results are rated

amfori BSCI scores 13 performance areas. Each area gets a rating from A to E, built from YES, NO or PARTIALLY answers. "Crucial questions" on child labour, bonded labour and health and safety weigh most, according to amfori's support page. amfori calculates the overall rating automatically.

The rating then sets the next step. TÜV NORD's service description says A or B needs no professional follow-up. C, D or E requires an improvement plan within 60 days and a follow-up audit within 12 months. The report must be uploaded within 15 calendar days of the last audit day.

SMETA works differently. Sedex calls it "a continuous improvement methodology rather than a certification". There is no pass or fail; buyers read the non-compliances and the CAP themselves. Ask which version was used, since SMETA 7 is the latest, and whether the audit had 2 or 4 pillars.

amfori BSCI ratings A to E and the follow-up each one triggers: 60-day improvement plan and follow-up audit within 12 months for C, D or Eamfori BSCI: 13 performance areas, one rating from A to EAnswers per question: YES, NO or PARTIALLY; crucial questions weigh mostABCDEA or BNo professional follow-up neededFactory keeps improving on its ownNext audit date: set by theamfori audit cycleC, D or E60 daysimprovement plan due after the audit2 to 12 monthswindow for the follow-up audit12 monthsno follow-up means a new full auditSource: TÜV NORD CERT amfori BSCI service description; amfori support page. Report uploaded within 15 days.
amfori BSCI ratings A to E and what each one triggers next, per the TÜV NORD service description

Factory audit vs inspection: when each one wins

An inspection is cheaper per visit and tells you whether this batch can ship. An audit costs similar money but tells you whether to trust the supplier at all. They work best together, at different moments.

1. When an audit beats an inspection

Choose an audit before your first large deposit, when you plan repeat orders, or when you need proof for a customer. An audit also helps when the supplier may be a trading company that subcontracts. QIMA offers unannounced ethical audits to "detect unauthorized subcontracting".

2. When an inspection beats an audit

Choose an inspection for a small trial order, a supplier you already know, or any balance payment. An audit never replaces the check on finished goods. A good factory can still ship a bad batch.

3. When you need both

For a new supplier and a large order, book the audit before the deposit and an inspection before the balance. After a strong audit, many buyers move to inspections only, with a re-audit every year or two.

Booking timeline: from request to corrective actions

Audits need more notice than inspections, because the factory must prepare documents and staff. Bureau Veritas's terms ask for requests 30 calendar days before the desired date. V-Trust recommends booking at least three days ahead, and sometimes offers next-day audits in clusters.

Cancellation is where costs appear. Bureau Veritas charges 50.00% of man-day fees for cancelling 3 to 5 working days before, if auditors cannot be reassigned. Inside 3 working days, it charges 100.00%. If the factory denies access, the audit is "invoiced in full".

After the audit day, V-Trust offers a same-day draft and a signed report within 2 days. For amfori BSCI, the 15-day upload rule and the 60-day improvement plan set the pace. Follow-up audits for C, D or E ratings come 2 to 12 months later.

Timeline of a factory audit booking with Bureau Veritas notice and cancellation fees, V-Trust booking and report times, and BSCI deadlinesBooking timeline: from request to corrective actionsPublished rules from V-Trust, Bureau Veritas (BV) terms and the amfori BSCI scheme; not to scaleDay −30Request (BV terms)BV asks 30 calendar daysDay −5 to −3Cancel: 50.00%of man-day fees (BV)Day −3V-Trust: bookat least 3 days aheadDay −3 to 0Cancel: 100.00%plus expenses (BV)Day 0Audit on site1 to 2 man-daysDay +2Signed reportV-Trust, draft same dayDay +15BSCI uploadcalendar daysDay +60BSCI planif C, D or EAccess denied on the day? BV invoices the audit in full. Express booking under 48 working hours: +30.00%.
Timeline from request to follow-up, with the published notice, cancellation and report deadlines

Here is what this means in practice. Send the audit request as soon as the sample is approved. Tell the supplier the audit is a condition of the deposit, and write it into your contract. Our guide to contract clauses with a Chinese supplier shows the wording.

Worked example: audit cost vs risk avoided

Example: a Rotterdam importer plans four orders of kitchen scales a year, each USD 30,000.00, from a new supplier. A second case is a single USD 5,000.00 trial order. The audit price is V-Trust's published rate; the risk figures are labelled assumptions.

LineRepeat programmeTrial orderHow it is calculated
A. Orders per year41Buyer's plan
B. Value per orderUSD 30,000.00USD 5,000.00Buyer's plan
C. Yearly spendUSD 120,000.00USD 5,000.00A × B
D. Audit man-days21Manufacturing audit vs short visit
E. Audit costUSD 796.00USD 398.00D × USD 398.00
F. Loss if an order fails (assumption)USD 12,000.00USD 2,000.0040.00% of B: rework, air freight, lost sales
G. Failure chance without audit (assumption)8.00%8.00%Per order
H. Failure chance with audit (assumption)3.00%3.00%Per order
I. Expected loss without auditUSD 3,840.00USD 160.00A × G × F
J. Expected loss with auditUSD 1,440.00USD 60.00A × H × F
K. Risk avoidedUSD 2,400.00USD 100.00I − J
L. Net benefitUSD 1,604.00−USD 298.00K − E
M. Break-even risk cut1.66 points19.90 pointsE ÷ (A × F)

The repeat programme wins clearly. The audit costs 0.66% of yearly spend (USD 796.00 ÷ USD 120,000.00). It pays off if it lowers the failure chance by just 1.66 percentage points.

The trial order is the opposite case. The audit would need to cut the failure chance by 19.90 points to break even. For that order, free desk checks plus a pre-shipment inspection make more sense.

Waterfall chart: expected loss falls from USD 3,840.00 to USD 1,440.00, so a USD 796.00 audit leaves USD 1,604.00 net benefitExample: a USD 796.00 audit against USD 2,400.00 of risk avoided4 orders × USD 30,000.00 a year; loss and failure rates are labelled assumptions0.001,000.002,000.003,000.004,000.00USD 3,840.00Expected losswithout audit−USD 2,400.00Risk avoidedby the auditUSD 1,440.00Expected losswith auditUSD 796.00Audit cost2 × USD 398.00USD per yearRepeat programme: net USD 1,604.00USD 2,400.00 avoided − USD 796.00 auditBreak-even: 1.66-point cut in failure chanceTrial order: net −USD 298.00USD 100.00 avoided − USD 398.00 auditBetter: desk checks plus an inspection
Example: on USD 120,000.00 of yearly orders, a USD 796.00 audit leaves a net benefit of USD 1,604.00 under the stated assumptions

Change the assumptions to your own numbers. Losing a key retail customer makes line F grow fast. The rule: audit when the money at risk is many times the fee.

By region: MENA, Europe and UK, USA

MENA: no general law requires a social audit, but some product schemes include a factory audit. SGS describes factory audits and surveillance audits as steps for the Saudi Quality Mark (SGS). Gulf buyers supplying European retailers often face BSCI or SMETA requests.

Europe and UK: the EU forced labour ban applies from 14/12/2027 (Finnish Government). In the UK, firms with turnover of GBP 36.00 million or more publish a modern slavery statement (GOV.UK). Audit reports help document supply chain due diligence.

USA: since 21/06/2022, CBP presumes goods made wholly or partly in Xinjiang are barred under the UFLPA (CBP). Importers must prove otherwise by "clear and convincing evidence". A social audit alone is not supply chain tracing, so keep material records too.

What goes wrong in practice (and what to do)

An audit is only as useful as its scope and timing. These problems cost importers money; each has a fix.

1. The wrong factory gets audited

A trading company may show you a partner's factory. Send the exact address and licence number to the auditor. Ask for a photo of the gate sign and the business licence on the wall.

2. The scope misses your product

A generic checklist may skip the process that matters, such as welding or injection moulding. Send your product drawings and key specifications with the booking. Ask for a section on your product line.

3. A certificate is taken at face value

An ISO 9001 or BSCI document can be expired or issued by an unaccredited body. Check ISO certificates on IAF CertSearch and ask for the BSCI rating date.

4. The supplier cancels or delays the visit

Late cancellation can cost 50.00% to 100.00% of the fee under Bureau Veritas terms. Agree the date in writing and make the supplier responsible for access.

5. The corrective action plan is never closed

A C rating or a list of findings means little without follow-up. Tie your next order to proof that each finding is fixed, with photos or a follow-up visit.

Six red flags and six green flags to look for when reading a factory audit reportReading the report: red flags and green flagsA high score with red flags is worth less than a modest score with clean evidenceRed flags: stop and ask✕Address differs from the business licence✕Only idle machines in the photos✕Certificate not found on IAF CertSearch✕Audit date moved twice by the supplier✕Findings listed with no evidence✕CAP with no dates or ownersGreen flags: evidence you can trust✓Gate sign and licence photographed✓Lines running your type of product✓Calibration labels on test equipment✓Auditor chose the date and the route✓Each finding has evidence and severity✓CAP closed with photos before the order
Red flags and green flags in a factory audit report, from address mismatches to closed corrective actions

If the audit fails, do not argue over the score. Ask the factory for a dated corrective action plan. If it refuses, keep your deposit and walk away. If you still need the product, the step-by-step guide to importing from China shows where to restart supplier selection.

Factory audit checklist

Glossary

Factory audit: an on-site assessment of a supplier's capacity, systems and practices, not of one batch.

Man-day: one auditor working one day; Bureau Veritas caps it at 12 hours including travel.

amfori BSCI: a social compliance code with 13 performance areas, rated A to E.

SMETA: Sedex Members Ethical Trade Audit, a 2-pillar or 4-pillar social audit method.

ISO 9001: the international standard for quality management systems (QMS).

CAP: corrective action plan, the dated list of fixes after an audit.

Unannounced audit: a visit without notice to the factory, used to spot hidden practices.

Subcontracting: when your supplier passes all or part of the work to another factory.

FAQ

How much does a factory audit in China cost?

V-Trust publishes USD 398.00 per man-day, all-inclusive. QIMA, HQTS, Intertek, SGS and Bureau Veritas quote on request. Most manufacturing audits take 1 to 2 man-days (indicative).

How long does a factory audit take?

The site visit usually lasts one or two days. V-Trust delivers a signed report within 2 days. Social audits on larger sites can take longer.

What is the difference between a factory audit and an inspection?

An audit checks the supplier's ability and systems. An inspection checks one batch of finished goods. Most large orders need both, at different stages.

Who pays for the factory audit, buyer or supplier?

Usually the buyer books and pays, to keep the auditor independent. For social audits, factories sometimes pay to share one report with many buyers.

Is an ISO 9001 certificate enough?

No. It shows a system exists, not that your product line follows it. Check the certificate on IAF CertSearch and audit the process that matters.

What does a BSCI C rating mean?

It means improvement is needed. Under TÜV NORD's service description, the factory must submit a plan within 60 days. A follow-up audit is due within 12 months.

Can I see a sample factory audit report first?

Yes. QIMA publishes a sample report page, and V-Trust and HQTS send samples on request. Ask for one before booking.

Can a factory refuse an audit?

It can, but that is a warning sign. Make the audit a contract condition. Under Bureau Veritas terms, a denied visit is still invoiced in full.

How often should a supplier be re-audited?

Many buyers re-audit every year or two. Re-audit sooner after a failed inspection, a new production site or a C to E social rating.

What is a China factory audit?

It is an on-site check of the supplier's company, not of one batch of goods. Auditors review the company profile, organisation, processes, capacity, machinery and the quality system. V-Trust publishes USD 398.00 per man-day, all-inclusive.

Is a factory audit in China worth it for a first order?

It pays off when the order is large or the supplier is new. In our worked example, a USD 796.00 audit cut the expected loss from USD 3,840.00 to USD 1,440.00. On a small trial order, a pre-shipment inspection may be enough.

Sources

23 official and provider pages, each with the date we checked it
Spotted a fee or rule that changed? Report an outdated fee and we will re-check it against the source.